Step 01

Measure & mark.

Walk the yard with you. Mark the run, the slope, the drainage line. We catch the problems on paper before they become problems in stone. No surprise change orders.

Step 02

Excavate & base.

Six inches of compacted gravel, plate-tamped in lifts. The base is the part you'll never see and the part that decides whether the patio is still flat in 2046. This is where corners get cut. Not here.

Step 03

Install & restrain.

Pavers laid by hand to the line. Steel restraint along every edge. Cuts dialed at the saw, not improvised. The edge is what fails first on a bad install — so we build it last and build it tight.

Step 04

Sweep, seal, walk.

Polymeric sand swept hot, activated, locked. Surface clean. Then we walk it with you — every joint, every cut, every transition. You sign off, not us.